This project involves reconfiguring most of the first floor, replacing all windows and siding, and a two-story addition.  The addition contains a new mudroom / laundry room, guest room and bathroom on the first floor and a new master bathroom and walk-in closet on the second floor.  (in collaboration with Custom Design/Build) 

 

WHOLE-HOUSE REMODEL ON DANIEL - ANN ARBOR, MI

L  E  W  I  S      G  R  E  E  N  S  P  O  O  N

A    R    C    H    I    T    E    C    T    S

Copyright © Lewis Greenspoon Architects. All rights reserved.