This project included a new chapel addition as well as remodeling projects throughout the building.  Classrooms, library, nave, and narthex were all remodeled, and a barrier-free lift was added to gain access to the social hall.  (while with A3C Collaborative Architecture)

 

FIRST PRESBYTERIAN CHURCH - ANN ARBOR, MI

L  E  W  I  S      G  R  E  E  N  S  P  O  O  N

A    R    C    H    I    T    E    C    T    S

Copyright © Lewis Greenspoon Architects. All rights reserved.